Document Fragmentation
Specifications, narratives, I/O lists and PLC logic live in different places.
Engineers spend valuable time searching documents, cross-checking information and manually transferring requirements into test sheets.
Close the gap between project specifications, PLC logic and FAT execution.
Test Manager gives engineers a structured workspace to review, correct and approve test logic before it reaches the execution stage.
It receives drafted test logic from the Spec-to-CSV Engine, puts engineering review at the centre of the workflow, and prepares approved tests for the CSV-to-PLC execution layer.
AI-assisted preparation · SME review · Controlled approval · Execution-ready output
Functional testing often becomes difficult at the end of a project—not because the PLC cannot execute the test, but because the information required to define, review, document and prove the test is spread across multiple documents and engineering systems.
Specifications, narratives, I/O lists and PLC logic live in different places.
Engineers spend valuable time searching documents, cross-checking information and manually transferring requirements into test sheets.
The design document, test case and implemented PLC logic can gradually diverge.
Without a controlled review process, changes made during engineering and commissioning can create inconsistencies that are difficult to identify later.
Experienced engineers spend too much time preparing repetitive test documentation.
Copying requirements from specifications into Excel-based test procedures adds effort without adding engineering value.
Test evidence needs to tell a clear story.
At handover, project teams need to demonstrate what was tested, against which requirement, who approved it, what happened during execution and what evidence was produced.
The Test Manager does not replace engineering judgement.
It creates a controlled workflow around it.
AI can help extract and structure potential test logic. The Test Manager gives Subject Matter Experts a central place to review that logic, make corrections, approve the final test and prepare it for controlled execution.
Automate the preparation. Keep engineering judgement in control.
Test Manager sits between automated test preparation and automated test execution.
It connects the three stages of the ControlSpec validation workflow:
The Spec-to-CSV Engine performs the upstream document-processing work and produces structured draft test information.
Test Manager is where engineers review the proposed logic, resolve issues and approve the test definition.
CSV-to-PLC takes approved test information into the execution workflow.
Results and execution evidence can be associated with the approved test definition for project records and handover.
Test Manager receives structured test logic prepared by the upstream Spec-to-CSV Engine.
Instead of starting from scratch, engineers work from a proposed test definition and focus their time on checking engineering intent, identifying gaps and making corrections.
Automation does not remove the need for engineering judgement.
Test Manager gives Subject Matter Experts a controlled environment to review proposed tests, edit information, add comments and approve the final test definition.
Connect each test to its originating requirement, specification reference or engineering intent.
This creates a clearer relationship between:
Requirement → Test Case → Approval → Execution → Evidence
Replace scattered spreadsheets and email updates with a central view of test progress.
Engineers can quickly identify tests that are:
Once the SME review is complete, approved test information can be passed to the CSV-to-PLC execution layer.
The objective is simple:
No uncontrolled handoff between test preparation and test execution.
Capture the relationship between the approved test, its execution result and the associated evidence.
Instead of reconstructing the test history at project close-out, create a structured record throughout the validation process.
Test Manager is designed to support structured functional testing and project documentation workflows, including workflows aligned with IEC 62381 requirements where applicable.
The platform should help engineering teams maintain consistent test definitions, review records and evidence without relying on manual reformatting between disconnected documents.
Built to support structured, traceable and reviewable functional testing workflows.
Test Manager receives draft test information generated by the upstream Spec-to-CSV Engine.
The SME checks the requirement, process intent, conditions, actions and expected results.
The test is either approved or returned with changes required.
Approved tests move into the CSV-to-PLC execution workflow.
Your priority: A controlled and defensible testing process.
You need visibility over what has been tested, what remains outstanding and whether the test definition reflects the engineering intent.
Test Manager helps you:
Your priority: Reduce engineering effort without reducing engineering control.
Senior engineers should spend their time resolving technical issues—not manually transferring requirements between PDFs, Word documents and Excel sheets.
Test Manager helps you:
Your priority: Visibility, risk reduction and predictable project delivery.
You need to know whether the testing process is progressing and where engineering bottlenecks are developing.
Test Manager helps you:
The difference is not simply automation. It is a controlled validation workflow.
Industrial projects contain commercially sensitive information including equipment specifications, process narratives, control philosophy and PLC-related engineering data.
The platform should be designed with appropriate controls for handling this information, including secure access, controlled data handling and deployment options appropriate to the project environment.
See how Test Manager can fit between your engineering specifications and your PLC validation workflow.
No. Test Manager is designed to reduce repetitive preparation work while keeping engineering review and approval within the workflow.
Test Manager receives structured draft test logic from the Spec-to-CSV Engine. Engineers can then review and modify the proposed test before approval.
Yes. The workflow is specifically designed around SME review, correction and approval.
Test Manager is the review and approval layer. Approved tests are intended to move into the CSV-to-PLC execution layer.
No. The concept is to work around the existing engineering and execution environment rather than replace the PLC or SCADA platform.
No. Test Manager is designed to support structured and traceable functional testing workflows aligned with applicable project requirements and standards, including IEC 62381 where relevant. That is not an automatic compliance guarantee.